Day 4 and Day 5 were digging holes. Lots of holes. In all, there were 1440 holes dug. It took just over 2 days to dig them all. The biggest impediment was heat. There was a slight heat wave for Spring there, and it did reach 39 degrees at some point. There was definitely the need for a lot of water and breaks. Theres just one photo of the plots (not taken by me), with the diggings in them.